Projects

Every project tells the same story: a real problem, a proven solution, and a result we stand behind.

Odor control

Odor control projects

💨
Municipal

Ashkelon WWTP — headworks

Three-stage · 25,000 m³/hr

99% H₂S & ammonia removal
↓ Download case study
💨
Municipal

Pump station — Rishon Le Zion

Bi-Polar ionization · 4,000 m³/hr

99% H₂S removal · zero complaints
↓ Download case study
💨
Municipal

Pump station — Eilat

Carbon scrubber · 4,000 m³/hr

99% H₂S removal · complaints eliminated
↓ Download case study
Water & wastewater

Water treatment & wastewater equipment

💧
Water treatment

Municipal water filtration plant

Activated carbon + multimedia filtration

Drinking water standards achieved
↓ Download case study
⚙️
Wastewater equipment

WWTP headworks — Northern district

Screens, aerators & pre-treatment

Full electromechanical supply & install
↓ Download case study
💧
Water treatment

Reverse osmosis plant

Industrial process water · desalination

Target water quality achieved
↓ Download case study

Have a similar project?

Tell us about your site — we'll come back with an honest recommendation.

Get in touch
Etaniv B.Y. ltdWater and Environment Technologies
© 2026 Etaniv Ltd. All rights reserved.
Home About Services Products Projects Contact